From a rough request to a spec
How it works
- Paste the request, or attach the document it came in.
- The spec takes shape: description, inputs, the output you want and the rules to follow.
- Fill the gaps as you go — the spec is what everyone works from.
In this work
- Attach the RFP; its requirements become a checklist in the spec.
- Ask a kWorker to list what the spec doesn’t cover yet.

kchloe screen · sample data

